docs(04-03): complete live reload plan — project complete
- Create 04-03-SUMMARY.md documenting FileWatcher integration - Update STATE.md: Phase 4 COMPLETE, project COMPLETE, 100% progress - Update ROADMAP.md: 04-03 checked, Phase 4 3/3 Complete with date - Update REQUIREMENTS.md: LIVE-01, BBS-01, BBS-02 marked complete
This commit is contained in:
@@ -15,7 +15,7 @@ Decimal phases appear between their surrounding integers in numeric order.
|
||||
- [x] **Phase 1: Safety Foundation** - Process lifecycle safety, shell integration, and configuration (completed 2026-02-28)
|
||||
- [x] **Phase 2: Vault Core and Rendering** - Markdown parsing pipeline and full content display (completed 2026-02-28)
|
||||
- [x] **Phase 3: Navigation and Links** - Link following, back/forward history, link cycling (completed 2026-02-28)
|
||||
- [ ] **Phase 4: BBS Polish and Live Content** - Retro aesthetic, filesystem watching, directory listing
|
||||
- [x] **Phase 4: BBS Polish and Live Content** - Retro aesthetic, filesystem watching, directory listing (completed 2026-03-01)
|
||||
|
||||
## Phase Details
|
||||
|
||||
@@ -75,11 +75,11 @@ Plans:
|
||||
2. Each page shows the file's last-modified timestamp
|
||||
3. When a markdown file in the vault is modified on disk, the currently displayed page auto-refreshes without the user doing anything
|
||||
4. User can navigate to a vault-wide directory listing showing all available documents
|
||||
**Plans:** 2/3 plans executed
|
||||
**Plans:** 3/3 plans complete
|
||||
Plans:
|
||||
- [x] 04-01-PLAN.md — ANSI splash screen on index.md and file metadata in status bar
|
||||
- [ ] 04-02-PLAN.md — Virtual directory listing via [[Directory]] wiki-link
|
||||
- [ ] 04-03-PLAN.md — Live filesystem watching with auto-refresh
|
||||
- [x] 04-02-PLAN.md — Virtual directory listing via [[Directory]] wiki-link
|
||||
- [x] 04-03-PLAN.md — Live filesystem watching with auto-refresh
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -91,4 +91,4 @@ Phases execute in numeric order: 1 → 2 → 3 → 4
|
||||
| 1. Safety Foundation | 3/3 | Complete | 2026-02-28 |
|
||||
| 2. Vault Core and Rendering | 3/3 | Complete | 2026-02-28 |
|
||||
| 3. Navigation and Links | 2/2 | Complete | 2026-02-28 |
|
||||
| 4. BBS Polish and Live Content | 2/3 | In Progress| |
|
||||
| 4. BBS Polish and Live Content | 3/3 | Complete | 2026-03-01 |
|
||||
|
||||
Reference in New Issue
Block a user