docs(04-03): complete live reload plan — project complete

- Create 04-03-SUMMARY.md documenting FileWatcher integration
- Update STATE.md: Phase 4 COMPLETE, project COMPLETE, 100% progress
- Update ROADMAP.md: 04-03 checked, Phase 4 3/3 Complete with date
- Update REQUIREMENTS.md: LIVE-01, BBS-01, BBS-02 marked complete
This commit is contained in:
2026-03-01 11:30:37 +01:00
parent f3133dd8dc
commit 2e0c9d2277
4 changed files with 157 additions and 29 deletions
+21 -16
View File
@@ -5,23 +5,23 @@
See: .planning/PROJECT.md (updated 2026-02-28)
**Core value:** Users can connect via SSH and seamlessly browse a vault of linked markdown documents with retro BBS aesthetics
**Current focus:** Phase 4 IN PROGRESS — Plans 01-02 done, Plan 03 (live reload) remaining
**Current focus:** PROJECT COMPLETE — All 4 phases and 10 plans executed
## Current Position
Phase: 4 of 4 (BBS Polish and Live Content) — IN PROGRESS
Plan: 2 of 3 in current phase (04-01, 04-02 done, 04-03 next)
Status: 04-02 complete — [[Directory]] virtual page with tree view, Tab-cycling, history back/forward
Last activity: 2026-03-01 — Plan 02 complete (DirEntry, list_vault_files, navigate_to_directory, build_directory_lines)
Phase: 4 of 4 (BBS Polish and Live Content) — COMPLETE
Plan: 3 of 3 in current phase (04-01, 04-02, 04-03 all done)
Status: PROJECT COMPLETE — live reload with 300ms debounce, scroll preservation, and non-fatal watcher failure handling
Last activity: 2026-03-01 — Plan 03 complete (FileWatcher, reload_current_document, rewatch_for_current_page, try_recv drain loop)
Progress: [█████████] 87%
Progress: [█████████] 100%
## Performance Metrics
**Velocity:**
- Total plans completed: 9
- Average duration: 3.1 min
- Total execution time: 0.44 hours
- Total plans completed: 10
- Average duration: 3.5 min
- Total execution time: 0.58 hours
**By Phase:**
@@ -30,10 +30,10 @@ Progress: [█████████░] 87%
| 01-safety-foundation | 3 | 7 min | 2.3 min |
| 02-vault-core-and-rendering | 3 | 9 min | 3.0 min |
| 03-navigation-and-links | 2 | 7 min | 3.5 min |
| 04-bbs-polish-and-live-content | 2 | 12 min | 6.0 min |
| 04-bbs-polish-and-live-content | 3 | 19 min | 6.3 min |
**Recent Trend:**
- Last 5 plans: 2 min, 4 min, 3 min, 4 min, 8 min
- Last 5 plans: 4 min, 3 min, 4 min, 8 min, 7 min
- Trend: Stable
*Updated after each plan completion*
@@ -76,19 +76,24 @@ Recent decisions affecting current work:
- [Phase 04]: resolve_wiki_link() Directory sentinel placed before rfind('/') split — prevents 'directory' being misinterpreted as a subpath prefix
- [Phase 04]: navigate_back/forward use if/else-if branch for __directory__ not load_document — avoids spurious Missing document state for virtual page
- [Phase 04]: handle_resize() returns early for __directory__ — raw_content is None for virtual pages, prevents stale-content confusion
- [Phase 04-03]: Watch parent directory (not the file itself) — survives atomic saves where editors rename temp file over target
- [Phase 04-03]: try_recv drain loop per poll iteration — drains all queued events, debounce collapses burst into single reload
- [Phase 04-03]: FileWatcher initialized in main.rs before App::new() — avoids self-referential ownership, keeps constructor pure
- [Phase 04-03]: Non-fatal watcher failure — warning printed, None passed to App, app runs without live reload
### Pending Todos
None.
None. Project complete.
### Blockers/Concerns
- **REND blocker resolved**: renderer.rs uses no Widget trait at all — `render_markdown()` returns `Vec<Line<'static>>` which Plan 03 passes to `Paragraph::new()`. No custom Widget needed.
All blockers resolved:
- **REND blocker resolved**: renderer.rs uses no Widget trait at all
- **NAV path traversal resolved**: is_within_vault() with canonicalize + starts_with guards all link resolution in vault.rs
- **LIVE**: notify 8.x API must be verified at integration time; watch only current file (not full vault) to avoid inotify exhaustion
- **LIVE resolved**: notify 6.1 API verified; parent-directory watch pattern avoids inotify exhaustion and survives atomic saves
## Session Continuity
Last session: 2026-03-01
Stopped at: Completed 04-02-PLAN.md
Resume file: .planning/phases/04-bbs-polish-and-live-content/04-03-PLAN.md
Stopped at: PROJECT COMPLETE — Completed 04-03-PLAN.md (final plan)
Resume file: N/A — project complete