docs(02-03): complete app integration plan — Phase 2 all 3 plans done
- Create 02-03-SUMMARY.md documenting DocumentState, scrolling, status bar, error screen - Update STATE.md: Phase 2 complete, 6 total plans, Phase 3 next - Update ROADMAP.md: Phase 2 all 3 plans SUMMARY present, marked Complete - Mark NAV-05, NAV-08, NAV-09 requirements complete in REQUIREMENTS.md
This commit is contained in:
+16
-13
@@ -5,33 +5,33 @@
|
||||
See: .planning/PROJECT.md (updated 2026-02-28)
|
||||
|
||||
**Core value:** Users can connect via SSH and seamlessly browse a vault of linked markdown documents with retro BBS aesthetics
|
||||
**Current focus:** Phase 2 in progress — Plans 01-02 complete (vault core + highlighter + renderer)
|
||||
**Current focus:** Phase 2 COMPLETE — all 3 plans done (vault + highlighter + renderer + app integration)
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 2 of 4 (Vault Core and Rendering) — IN PROGRESS
|
||||
Plan: 2 of 3 in current phase (plans 01-02 done)
|
||||
Status: Phase 2 Plan 02 complete — Plan 03 (app integration + scrolling) next
|
||||
Last activity: 2026-02-28 — Plan 02 complete (renderer.rs with full markdown pipeline)
|
||||
Phase: 2 of 4 (Vault Core and Rendering) — COMPLETE
|
||||
Plan: 3 of 3 in current phase (all plans done)
|
||||
Status: Phase 2 complete — Phase 3 (Navigation) next
|
||||
Last activity: 2026-02-28 — Plan 03 complete (app.rs wired with document display, scrolling, status bar)
|
||||
|
||||
Progress: [█████░░░░░] 50%
|
||||
Progress: [███████░░░] 63%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 5
|
||||
- Average duration: 2.6 min
|
||||
- Total execution time: 0.21 hours
|
||||
- Total plans completed: 6
|
||||
- Average duration: 2.7 min
|
||||
- Total execution time: 0.27 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 01-safety-foundation | 3 | 7 min | 2.3 min |
|
||||
| 02-vault-core-and-rendering | 2 | 6 min | 3.0 min |
|
||||
| 02-vault-core-and-rendering | 3 | 9 min | 3.0 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 2 min, 3 min, 2 min, 2 min, 4 min
|
||||
- Last 5 plans: 3 min, 2 min, 2 min, 4 min, 3 min
|
||||
- Trend: Stable
|
||||
|
||||
*Updated after each plan completion*
|
||||
@@ -61,6 +61,9 @@ Recent decisions affecting current work:
|
||||
- 02-02: Full emit_code_block and emit_table written in Task 1 (not stubs) — avoids throwaway code
|
||||
- 02-02: Box width for code blocks capped at terminal width — prevents border overflow on long lines
|
||||
- 02-02: Table n_cols derived from max(alignments.len(), max row length) — handles malformed GFM tables
|
||||
- [Phase 02-03]: raw_content stored in App for resize re-render — avoids disk re-read on window resize
|
||||
- [Phase 02-03]: draw_error_screen() unified for Missing and Error via Option<&str> reason parameter
|
||||
- [Phase 02-03]: Scroll keys placed before _ catch-all — j/k during quit prompt does not dismiss it
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -75,5 +78,5 @@ None.
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-02-28
|
||||
Stopped at: Completed 02-02-PLAN.md — renderer.rs created, cargo check clean
|
||||
Resume file: .planning/phases/02-vault-core-and-rendering/02-03-PLAN.md
|
||||
Stopped at: Completed 02-03-PLAN.md — app.rs wired with document display, scrolling, status bar, error screen; main.rs wired with highlighter init and vault loading
|
||||
Resume file: .planning/phases/03-navigation/ (Phase 3 plans)
|
||||
|
||||
Reference in New Issue
Block a user