docs(02-02): complete markdown renderer plan — REND-01 through REND-10 satisfied

- 02-02-SUMMARY.md: documents render_markdown() pipeline, code block borders, GFM table grid, decisions, deviations
- STATE.md: advance to plan 02 done, update decisions log (02-02 entries), resolve REND Widget trait blocker
- ROADMAP.md: mark 02-02 complete (2/3 plans done for Phase 2)
This commit is contained in:
2026-02-28 22:20:35 +01:00
parent 8690d2a857
commit b6069d90e5
3 changed files with 155 additions and 18 deletions
+17 -14
View File
@@ -5,33 +5,33 @@
See: .planning/PROJECT.md (updated 2026-02-28)
**Core value:** Users can connect via SSH and seamlessly browse a vault of linked markdown documents with retro BBS aesthetics
**Current focus:** Phase 2 in progress — Plan 01 complete (vault core + highlighter foundation)
**Current focus:** Phase 2 in progress — Plans 01-02 complete (vault core + highlighter + renderer)
## Current Position
Phase: 2 of 4 (Vault Core and Rendering) — IN PROGRESS
Plan: 1 of 3 in current phase (plan 01 done)
Status: Phase 2 Plan 01 complete — Plan 02 (markdown renderer) next
Last activity: 2026-02-28 — Plan 01 complete (deps, vault.rs, highlighter.rs)
Plan: 2 of 3 in current phase (plans 01-02 done)
Status: Phase 2 Plan 02 complete — Plan 03 (app integration + scrolling) next
Last activity: 2026-02-28 — Plan 02 complete (renderer.rs with full markdown pipeline)
Progress: [████░░░░░] 33%
Progress: [████░░░░░] 50%
## Performance Metrics
**Velocity:**
- Total plans completed: 4
- Average duration: 2.2 min
- Total execution time: 0.14 hours
- Total plans completed: 5
- Average duration: 2.6 min
- Total execution time: 0.21 hours
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 01-safety-foundation | 3 | 7 min | 2.3 min |
| 02-vault-core-and-rendering | 1 | 2 min | 2.0 min |
| 02-vault-core-and-rendering | 2 | 6 min | 3.0 min |
**Recent Trend:**
- Last 5 plans: 2 min, 3 min, 2 min, 2 min
- Last 5 plans: 2 min, 3 min, 2 min, 2 min, 4 min
- Trend: Stable
*Updated after each plan completion*
@@ -56,8 +56,11 @@ Recent decisions affecting current work:
- 01-03: app_config stored in App struct for Phase 2 access — vault_path accessible inside event loop
- 01-03: Quit prompt cleared on any non-Ctrl+C key — pressing any key dismisses double-press window
- 02-01: LinesWithNewlines iterator added to preserve trailing \n for syntect grammar correctness
- 02-01: mod declarations omitted from main.rs Plan 03 handles wiring for all Phase 2 modules
- 02-01: mod declarations added to main.rs during Plan 02 (not Plan 03) — compiler needs them to check renderer.rs
- 02-01: syntect default-fancy feature uses pure-Rust fancy-regex (avoids Oniguruma C lib)
- 02-02: Full emit_code_block and emit_table written in Task 1 (not stubs) — avoids throwaway code
- 02-02: Box width for code blocks capped at terminal width — prevents border overflow on long lines
- 02-02: Table n_cols derived from max(alignments.len(), max row length) — handles malformed GFM tables
### Pending Todos
@@ -65,12 +68,12 @@ None.
### Blockers/Concerns
- **REND**: ratatui 0.30 Widget trait confirmed: `impl Widget for &Foo` pattern required (NOT WidgetRef) — Plan 02 must use reference-based impl
- **REND blocker resolved**: renderer.rs uses no Widget trait at all — `render_markdown()` returns `Vec<Line<'static>>` which Plan 03 passes to `Paragraph::new()`. No custom Widget needed.
- **NAV**: Path traversal via wiki-links must be addressed in Phase 3 link resolver — canonicalize and prefix-check every resolved path
- **LIVE**: notify 8.x API must be verified at integration time; watch only current file (not full vault) to avoid inotify exhaustion
## Session Continuity
Last session: 2026-02-28
Stopped at: Completed 02-01-PLAN.md — vault.rs and highlighter.rs created, cargo build clean
Resume file: .planning/phases/02-vault-core-and-rendering/02-02-PLAN.md
Stopped at: Completed 02-02-PLAN.md — renderer.rs created, cargo check clean
Resume file: .planning/phases/02-vault-core-and-rendering/02-03-PLAN.md