2.5 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-02-28)
Core value: Users can connect via SSH and seamlessly browse a vault of linked markdown documents with retro BBS aesthetics Current focus: Phase 1 - Safety Foundation
Current Position
Phase: 1 of 4 (Safety Foundation) Plan: 2 of 3 in current phase Status: Executing — Plan 02 complete, Plan 03 next Last activity: 2026-02-28 — Plan 02 complete (terminal safety primitives)
Progress: [██░░░░░░░░] 17%
Performance Metrics
Velocity:
- Total plans completed: 2
- Average duration: 3 min
- Total execution time: 0.08 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-safety-foundation | 2 | 5 min | 2.5 min |
Recent Trend:
- Last 5 plans: 2 min, 3 min
- Trend: Stable
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Pre-Phase 1: Verify
edition = "2024"compiles before changing to 2021 — leave it ifcargo buildsucceeds - Pre-Phase 1: Use pulldown-cmark event-based approach for markdown parsing (not comrak)
- Pre-Phase 1: No tokio/async runtime — synchronous event loop only
- Pre-Phase 2: Choose wiki-link parsing strategy before implementation (regex pre-pass vs post-parse interception)
- 01-01: Resolve relative vault_path against config file parent dir (not cwd) — bbs.toml lives next to binary
- 01-01: detect_login_shell() called before parse_cli() — both read argv[0], parse_cli strips the dash
- 01-02: Use ratatui::crossterm re-export path — crossterm is transitive dep, not direct dep in Cargo.toml
- 01-02: SIGINT not registered via signal-hook — crossterm key events handle double-press Ctrl+C in Plan 03
- 01-02: restore_terminal() skips ratatui::restore() — that would call LeaveAlternateScreen (never entered)
Pending Todos
None yet.
Blockers/Concerns
- REND: Verify ratatui 0.30 custom Widget trait signature before building BBS widgets (changed between 0.28 and 0.29)
- NAV: Path traversal via wiki-links must be addressed in Phase 3 link resolver — canonicalize and prefix-check every resolved path
- LIVE: notify 8.x API must be verified at integration time; watch only current file (not full vault) to avoid inotify exhaustion
Session Continuity
Last session: 2026-02-28 Stopped at: Completed 01-02-PLAN.md — terminal safety primitives committed Resume file: .planning/phases/01-safety-foundation/01-03-PLAN.md