- 01-03-SUMMARY.md: documents App struct, event loop, double-Ctrl+C state machine, main.rs pipeline - STATE.md: Phase 1 complete, 3/3 plans done, Phase 2 next, 01-03 decisions recorded - ROADMAP.md: Phase 1 marked Complete (3 plans / 3 summaries) - REQUIREMENTS.md: SHEL-01 marked complete
2.9 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-02-28)
Core value: Users can connect via SSH and seamlessly browse a vault of linked markdown documents with retro BBS aesthetics Current focus: Phase 1 complete — Phase 2 next (Content Rendering)
Current Position
Phase: 1 of 4 (Safety Foundation) — COMPLETE Plan: 3 of 3 in current phase (all plans done) Status: Phase 1 complete — Phase 2 ready to start Last activity: 2026-02-28 — Plan 03 complete (event loop + main.rs wiring)
Progress: [███░░░░░░░] 25%
Performance Metrics
Velocity:
- Total plans completed: 3
- Average duration: 2.3 min
- Total execution time: 0.12 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-safety-foundation | 3 | 7 min | 2.3 min |
Recent Trend:
- Last 5 plans: 2 min, 3 min, 2 min
- Trend: Stable
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- Pre-Phase 1: Verify
edition = "2024"compiles before changing to 2021 — leave it ifcargo buildsucceeds - Pre-Phase 1: Use pulldown-cmark event-based approach for markdown parsing (not comrak)
- Pre-Phase 1: No tokio/async runtime — synchronous event loop only
- Pre-Phase 2: Choose wiki-link parsing strategy before implementation (regex pre-pass vs post-parse interception)
- 01-01: Resolve relative vault_path against config file parent dir (not cwd) — bbs.toml lives next to binary
- 01-01: detect_login_shell() called before parse_cli() — both read argv[0], parse_cli strips the dash
- 01-02: Use ratatui::crossterm re-export path — crossterm is transitive dep, not direct dep in Cargo.toml
- 01-02: SIGINT not registered via signal-hook — crossterm key events handle double-press Ctrl+C in Plan 03
- 01-02: restore_terminal() skips ratatui::restore() — that would call LeaveAlternateScreen (never entered)
- 01-03: show_goodbye() called after restore_terminal() — terminal must be in cooked mode before println! is safe
- 01-03: app_config stored in App struct for Phase 2 access — vault_path accessible inside event loop
- 01-03: Quit prompt cleared on any non-Ctrl+C key — pressing any key dismisses double-press window
Pending Todos
None.
Blockers/Concerns
- REND: Verify ratatui 0.30 custom Widget trait signature before building BBS widgets (changed between 0.28 and 0.29)
- NAV: Path traversal via wiki-links must be addressed in Phase 3 link resolver — canonicalize and prefix-check every resolved path
- LIVE: notify 8.x API must be verified at integration time; watch only current file (not full vault) to avoid inotify exhaustion
Session Continuity
Last session: 2026-02-28 Stopped at: Completed 01-03-PLAN.md — Phase 1 complete, app event loop and main.rs pipeline committed Resume file: .planning/phases/02-content-rendering/ (next phase)