66 lines
2.0 KiB
Markdown
66 lines
2.0 KiB
Markdown
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-02-28)
|
|
|
|
**Core value:** Users can connect via SSH and seamlessly browse a vault of linked markdown documents with retro BBS aesthetics
|
|
**Current focus:** Phase 1 - Safety Foundation
|
|
|
|
## Current Position
|
|
|
|
Phase: 1 of 4 (Safety Foundation)
|
|
Plan: 0 of 3 in current phase
|
|
Status: Planned — ready to execute
|
|
Last activity: 2026-02-28 — Phase 1 planned (3 plans, 2 waves)
|
|
|
|
Progress: [░░░░░░░░░░] 0%
|
|
|
|
## Performance Metrics
|
|
|
|
**Velocity:**
|
|
- Total plans completed: 0
|
|
- Average duration: -
|
|
- Total execution time: 0 hours
|
|
|
|
**By Phase:**
|
|
|
|
| Phase | Plans | Total | Avg/Plan |
|
|
|-------|-------|-------|----------|
|
|
| - | - | - | - |
|
|
|
|
**Recent Trend:**
|
|
- Last 5 plans: -
|
|
- Trend: -
|
|
|
|
*Updated after each plan completion*
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
Decisions are logged in PROJECT.md Key Decisions table.
|
|
Recent decisions affecting current work:
|
|
|
|
- Pre-Phase 1: Verify `edition = "2024"` compiles before changing to 2021 — leave it if `cargo build` succeeds
|
|
- Pre-Phase 1: Use pulldown-cmark event-based approach for markdown parsing (not comrak)
|
|
- Pre-Phase 1: No tokio/async runtime — synchronous event loop only
|
|
- Pre-Phase 2: Choose wiki-link parsing strategy before implementation (regex pre-pass vs post-parse interception)
|
|
|
|
### Pending Todos
|
|
|
|
None yet.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- **LIFE**: Panic hook and SIGHUP handling are highest priority — must land before any feature code
|
|
- **REND**: Verify ratatui 0.30 custom Widget trait signature before building BBS widgets (changed between 0.28 and 0.29)
|
|
- **NAV**: Path traversal via wiki-links must be addressed in Phase 3 link resolver — canonicalize and prefix-check every resolved path
|
|
- **LIVE**: notify 8.x API must be verified at integration time; watch only current file (not full vault) to avoid inotify exhaustion
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-02-28
|
|
Stopped at: Phase 1 planned, ready to execute
|
|
Resume file: .planning/phases/01-safety-foundation/01-01-PLAN.md
|